Xiangjiang water plant

2025.03.14
Project Name: Xiangyin County Urban and Rural Water Supply Integration Phase I Project
Project Water Quality: Tap water
Project Scale: The total design scale is 200,000 tons per day, and the recent scale is 100,000 tons per day.
Equipment Name: DBM - Model 12500 sodium hypochlorite generator
After the official operation of Xiangjiang Water Plant, the capacity to guarantee the safety of drinking water in Xiangyin County has been greatly improved. 410,000 people now enjoy urban and rural water supply with unified water source, pipe network, water quality, and service. This has realized the transformation from "having water to drink" to "drinking good water", and it is truly a popular, virtuous, and politically significant project.
The sodium hypochlorite generator of Guangzhou Xinao brand features a high degree of automation, simple operation, and low energy consumption, and is highly praised by users.
0
0

Contact Us

Have any question or feedback, feel free to reach out to us. We are always available to help.